Licensed Building Practitioner - Rolleston, Selwyn, Christchurch and Mid Canterbury Call Adam: 027 444 5657
Renovated bathroom with a glass shower, a timber-look wall-hung vanity and grey stone-look tiles on the floor and walls
Rolleston and Selwyn

Bathroom Renovations in Rolleston

Full bathroom renovations from strip-out to the last bead of silicone, by a Licensed Building Practitioner who organises the plumber and the electrician for you. The bathrooms in these photographs are all ours.

Licensed Building Practitioner 26 years in the trade Owner operated by Adam Hayde Based in Rolleston, Selwyn

A Bathroom Done Properly, Start to Finish

A bathroom is the most involved room in a house to renovate. Four trades work in a space the size of a wardrobe, in a strict order, and the part that matters most - the waterproof lining behind the tiles and under the shower - is the part nobody sees once it is finished. That is why a bathroom is a builder's job to run rather than a tiler's or a plumber's: someone has to own the sequence, and someone has to be responsible for what is behind the wall.

Hayde Construction renovates bathrooms across Rolleston and Selwyn as complete jobs. Adam strips the old room out, fixes whatever the strip-out finds, frames any changes, fits the wet-area linings, and builds the room back up - shower, vanity, bath, toilet, tiling, joinery, doors and trim. The plumber and the electrician are booked and sequenced by him, so you deal with one person and get one quote.

What a Bathroom Renovation Involves

  1. Look, talk, and a written quote

    Adam comes out, measures the room, checks what is behind the existing fittings where he can, and talks through what you want. The quote lists the building work and, where you want it, the plumbing and electrical, so the price is the whole price.

  2. Strip-out and repairs

    Old fittings, tiles and linings come out. This is where an older bathroom shows its secrets - a soft floor under the shower, framing that has been wet for years, a leaking waste. They get fixed now, while they are exposed, and you are told what was found.

  3. Framing, plumbing and wiring rough-in

    Any new nibs or walls are framed, a niche or a new window is built in, and the plumber and electrician run their pipes and cables to where the new fittings will be.

  4. Wet-area linings and waterproofing

    Moisture-resistant plasterboard or tile underlay in the wet areas, the shower base or tray set, and the membrane applied where it needs to be. This is the part that decides whether the bathroom is still dry in ten years.

  5. Tiling, fit-off and finishing

    Floor and wall tiles or the panel system you have chosen, then the shower glass, vanity, mirror, toilet, towel rail and tapware, the door and the trim. The plumber and electrician connect and test. The room is cleaned and handed back.

Wet Areas and the Building Code

The Building Code's clause on internal moisture, E3 Internal moisture, requires the surfaces in wet areas of a home to be impervious and easily cleaned, with ventilation, so that water cannot get into the building and cause rot or mould. In practice that means the right lining behind the tiles, a proper shower tray or membrane, sealed junctions, an extractor fan that actually vents outside, and a floor that falls to the waste. It is also the reason a bathroom done cheaply so often has to be done twice.

Whether a bathroom renovation needs a building consent depends on the job. Replacing fittings in the same positions generally does not; moving the toilet or the shower and changing the drainage generally does, and any structural change or new window is restricted building work that a Licensed Building Practitioner must do. Adam will tell you which applies before you commit, and handle the paperwork if a consent is needed.

What Affects the Cost and the Time

Two things move the price of a bathroom more than any other: whether the fittings stay where they are, and what you choose to put in. Keeping the toilet, shower and vanity in their existing positions keeps the plumbing simple. Moving them is entirely possible and often worth it, but the drainage work and a consent add to the job. On the finishes, a tiled floor and a tiled shower cost more than vinyl plank and an acrylic shower liner - and both can look good, as the bathrooms in our gallery show, because the difference is in the preparation and the finish rather than the price of the tile.

Most bathrooms take two to three weeks from strip-out to hand-over, allowing for the membrane and the tile adhesive to cure between steps. If the house has a second bathroom that is no hardship; if it does not, Adam will tell you exactly when the toilet and the shower will be out of action and keep it to the shortest window he can.

Bathrooms Are Often the Start

A lot of bathroom jobs turn into a laundry or a toilet at the same time, because the trades are already on site and the plumbing is already open. If the rest of the house is due some attention as well, our home renovations and alterations page covers the bigger picture, and the smaller jobs - a new extractor, a door that binds, a window that has rotted at the sill - come under repairs and maintenance. Either way it starts the same way: a look and a written quote.

Contact Us

To talk about a bathroom renovation in Rolleston, Lincoln, Prebbleton, West Melton, Darfield, Leeston, south-west Christchurch or Mid Canterbury, ring Adam on 027 444 5657 or send the details through the form below. A couple of photos of the room as it is now will get you a much more useful first conversation.

Black-framed glass shower and heated towel rail in a finished bathroom
Before and after

The Same Bathroom, Renovated

An older bathroom with green walls and a small vanity, stripped out and rebuilt with a wall-hung vanity, stone-look tiles and a heated towel rail. Both photographs are from the same job.

Before: an older bathroom with green walls, a small white vanity under the window and a worn vinyl floor
Before An older bathroom, green walls and a small vanity
After: the same bathroom with a wall-hung timber-look vanity, grey stone-look tiles and a heated towel rail
After Wall-hung vanity, stone-look tiles, heated towel rail
Before and after

Bath Out, Freestanding Bath In

A built-in bath in a tiled surround replaced with a freestanding bath under a new window, with a glass shower alongside.

Before: an older bath set in a tiled surround, with wallpapered walls and a small window
Before The old bath in its tiled surround
After: a freestanding bath under a new window, white walls and a glass shower beside it
After Freestanding bath under a new window
Sunlit timber greenhouse standing in a paddock

Bathroom Renovation Questions

How long will I be without a bathroom?

Usually two to three weeks from the day the old fittings come out. The toilet can often be kept working for part of that. Adam will give you the dates before the job starts and tell you as soon as anything changes them.

Do I need a building consent for a bathroom renovation?

Not for a like-for-like renovation where the fittings stay in the same place. Moving the plumbing, altering the structure or putting in a new window usually does need one. Adam will tell you which yours is at the quote stage and, if a consent is needed, it becomes part of the job.

Do you organise the plumber and electrician?

Yes. Sanitary plumbing and electrical work have to be done by people licensed for them, and Adam books, sequences and coordinates both so the job runs in the right order and you deal with one person.

Tiles or a shower liner?

Both are done well here. A tiled shower gives you any size, a niche and any look you like, and costs more in labour. An acrylic liner and tray is quicker, cheaper and completely watertight if it is fitted properly. Vinyl plank floors have become popular for good reason - warm, waterproof and easy to keep clean. Adam will show you what each looks like from jobs he has done.

Can I supply my own vanity and tapware?

Yes, as long as it is on site before it is needed and the plumber can get the right fittings for it. Tell Adam what you have in mind early so the framing and plumbing rough-in can be set out for it.

Get a quote

Talk to Adam About Your Job

Tell us what you have in mind and roughly where the house is. Adam will come and have a look, talk it through with you, and put a written quote in front of you - no obligation, anywhere in Rolleston, Selwyn, south-west Christchurch or Mid Canterbury.

027 444 5657
  • Rolleston, working across Selwyn, Christchurch and Mid Canterbury
  • Licensed Building Practitioner (Carpentry)
  • 26 years in the trade
  • Hayde Construction on Facebook

Photos help. A couple taken on your phone of the room, the deck site or the damage will let Adam give you a much more useful first answer.

Give Adam a call

027 444 5657

Hayde Construction, Rolleston